Saturday, August 29, 2009

MOVED IN!!!!



Well, we are all moved in!
HOORAY!
Greg was able to come home for a week from his CCL european adventure and help move us in, but we couldn't have done it without Jay Brown. He not only painted most of the inside of the house, but he helped move us out of the old place and into the rental and then back into the new place. I am absolutely certain that he is sick and tired of seeing our old piano and my treadmill by now. Thanks Jay Brown! We love you!


Our fridge was a housewarming gift from Greg's folks. We love it. Ferlin loves it. Thanks Clark and Carolyn.
Ok Greg, get back from tour already so we can enjoy this beautiful house that you built!


Saturday, July 25, 2009

Finishing Touches

The past couple of weeks have been chaotic over here as we prepared for the final inspections. Dad came up again to help complete the short list required for occupancy. While searching through the pile of leftover framing lumber for a 2 x 4, we found, and then exploited this little guy--a baby posssum.



Dad helped glue and clamp the douglas fir front door that I made.

This is the finished product--hung, with 2 of 3 coats of poly applied.

This is the fir back door we bought to match the front.

This is a photo of the kitchen cabinets with most of the drawer and door hardware attached. We cut the cobra soapstone to fit around the old sink, then sanded it and applied mineral oil to the top which turned it a rich dark black color.


Me setting a few nail heads deeper before the wood floor people showed up.

Short handrail sections were added to meet code requirements.

A close up of the handrail and newel post cap I made (doug fir as well)



The rooster came today.


A short video of the floor finishing crew in action.


Oh yeah, and we passed our final building inspection yesterday!
-Greg

Friday, July 10, 2009

more July photos

Greg has some shows up in Canada and I am holding down the fort, kind of. I've had a few meltdowns along the way.

The plumbers have come and gone- with only a couple walls torn up, one cracked pipe and our tile ripped out of the floor. The good news, we did eventually get water flowing, toilets and sinks in place and our old clawfoot tub in it's new home. Our tile was fixed too.

Greg's dad, Clark, also came up and helped us get the walkway completed and put the tongue and groove flooring in on the front porch. We are so thankful. He did so much and I hated seeing him leave today.





Friday, July 3, 2009

Happy 4th of July y'all

Time to relax, cook-out with friends and watch some fireworks at the fairground...eventually.

We are still working over here on the house and hope to finish up the front walkway in time to catch some 4th festivities. We are using up the rest of the old brick Greg's dad salvaged from a demolished home in Charlotte. We also passed our electrical inspection yesterday and now have running water! Tiling is finally finished too.

Getting so much closer everyday.



Friday, June 19, 2009

Hot Fun in the Summertime

I haven't updated in a while because things over here have been pretty hectic lately. The pressure is on and we are definitely feeling it. We are also feeling this hot, hot, hot North Carolina heat- almost 100 degrees yesterday. Greg's working non-stop 12 hour days trying to finish by the end of July. Everyday we cross something off our long list of things to do...I think it's getting shorter.

Thanks to some great help along the way, we are making some progress. Finishing the walls with subway tile in the guest bath is all that's left of tiling. Jay Brown is cutting some mighty fine lines while painting the inside. Fans and lights are going in right now thanks to Dave Wilson. Greg is building our kitchen cabinets and just finished the columns on the front porch. Greg's dad also came up and helped us finish the porch ceilings.

Here are some random photos taken over the past few weeks.
The front porch columns are finished- what a difference.
Jay Brown painting away.

Dave Wilson hooking up the lights and fans.

Back porch fans.

Guest bath and where the clawfoot goes.
G building our kitchen cabinets. We ordered our soapstone countertops yesterday which Greg is going to cut to fit.

Some video footage of the guys hauling the very heavy tub upstairs.
struggling a bit
Clark and Greg relaxing after putting up the porch ceiling.
Ferlin keeping cool in the pool.

Tuesday, May 19, 2009

We are tiling machines

Today, Greg & I started tiling our master bath using 1 inch hexagon tiles. We first did a dry run and cut all the tile to fit. Then we popped out white tiles and replaced them with some black ones to make a flower pattern. It was a fun time. Good thing Greg is good at math and with a ruler (and a good thing we had some cold ones waiting for us in the fridge). Tomorrow we grout and move on to the guest bath.



In case anyone is looking, we bought our tile from Luxe Tile- they have a great selection, are affordable and super nice.

Tuesday, May 12, 2009

5 steps closer...

I work at night, so Greg and I usually see each other for a few minutes in the early morning before I hit the hay. When I went to sleep this morning, these stairs did not exist. Greg and John worked all day long building the front porch steps out of some giant and very old treated pine boards that Greg's dad found for us. These boards were originally made for highway guard rails. What a lovely way to wake up.